Shop - Now Online Enthusiasts & Archive Timetables & Fares Victoria's Cafe
Llangollen Railway North Wales For Scenery
Llangollen Railways A Day Out With Thomas will be taking place on Saturday 1st & Sunday 2nd June. Please book your tickets at www.dayoutwiththomas.co.uk/llangollen.

Introducing Llangollen Railway

LLANGOLLEN RAILWAY is primarily a steam hauled Heritage Railway Line starting at Llangollen Station, located beside the Dee River Bridge, in Llangollen Town, the journey continues for 7 ½ miles upstream, following the River Dee to the village of Carrog. The Dee is classed as a Site of Special Scientific Interest (SSSI) for its entire length.

The line, located within an Area of Outstanding Natural Beauty (AONB), remains close to the waters of the river for most of its length, on the north bank at Llangollen Station, the river is crossed on to the south bank via the Dee Bridge, approximately one mile upstream from Llangollen.

Llangollen Railway was started in 1975 by a group of enthusiasts who saw the potential for a scenic heritage line through the Dee Valley. Their original vision grew into what you can see today.

7 ½ miles of track have been re-laid westwards along the track-bed of the old Ruabon to Barmouth main line, through  to Carrog, where the line presently terminates.

The old main line closed to passenger traffic in 1965 and to goods in 1968. The track, signaling and much of the infrastructure was removed or demolished quickly after this, although Llangollen, Berwyn and Carrog Station buildings survived.

The enthusiasts commemorated the re-opening in 1975 with an open day at Llangollen Station where 60 feet of track had been relaid. The rest, as they say, is history. Berwyn was reached in 1985, Deeside in 1990, Glyndyfrdwy in 1993 and Carrog in 1996.

Demolished infrastructure, such as the signal boxes at Llangollen Goods Junction, Deeside Halt, Glyndyfrdwy and Carrog were rebuilt from the ground up and are fully operational allowing multi train operation on gala days and busy weekends

The line then climbs steeply to reach Berwyn Station, from where the climb continues, through Berwyn Tunnel (1/3 mile) to Deeside Halt - a request stop only. From here the line rises gently for the next 2 miles to Glyndyfrdwy Station and village, and finally, on to Carrog on a gently rising grade.

The line is currently being extended to Corwen Town, it is hoped we will get there at the end of the 2013 season. (please see Corwen pages for more information)

 

For a membership form, please download the PDF below.

 

Download attached PDF
6430 and auto train coming out of Glyndyfrdwy

6430 and auto train coming out of Glyndyfrdwy

Photo: Frank Richards

Foxcote Manor

Foxcote Manor

Photo: Lewis Maddox

3802 express service to Carrog

3802 express service to Carrog

Photo: Frank Richards

View Gallery

Website Design, Developed and maintained by Pop Creative Ltd
Contact Us

EVENTS
Toggle

«

PAGE 01 OF 05

»

NEWS
Toggle

«

PAGE 01 OF 05

»
Holiday Let Gallery